Preliminary
|
Athletic Indoor Practice Facility-Construct Football Operations Fac.
Art Building-Construct New Facility
Hancher Replacement-Construct New Facility
IATL-Flood Mitigation and Permanent Recovery
IMU- Flood Mitigation & Permanent Recovery
IMU-Remodel & Deferred Maintenance
Psychology & Learning Center Building-Construct Facility
Theatre Bldg - Flood Mitigation & Permanent Recovery
Voxman Music Building-Clapp-Replacement-Construct New Facility
|
| Design |
|
BLB-Upgrade VAV & Occupancy Sensors
BBE,CB,DH,ML,PC,SH-Install Occupancy Sensors
BHC,BSB,PBB & usb-Install Occupancy Sensors
Bowen Science Building-Renovate Cores 2-200,2-300, & 2-400
Construct New University Housing
Dental Science Bldg-Phase 2-Renovate South Wing
Golf Training Facility - Construct
Hawkeye Court Apartments-Raze Building (Units 301-376)
Health Sciences Tunnel-Reconstruct Tunnel
LANDSCAPE-Pentacrest Pipe Rail & Sidewalk Improvements
LANDSCAPE-Rehabilitate Quad Ravine
Library-Learning Commons
Library-Install Sprinkler System Infrastructure
Music West Interim Building-Provide Temporary Accessible Entrance at North Facade
Oakdale Microwave Transmitter - Install Pre-Cast Concrete Transmitter Shelter for KSUI-FM
UIHC PARKING-West Campus Transportation Center
|
|
Construction
|
|
Art Building West - Flood Mitigation
Carver-Hawkeye Arena - Renovate Arena
CB-Renovate Auditorium W290
CMAB-Replace Windows
College of Nursing Building-Extend Sprinkler System
College of Public Health Building
Dental Science Bldg-Construct Addition Ph. 1
Dental Science Bldg-Renovate 4th Floor Labs
Hardin Library for the Health Sciences-Upgrade HVAC & Lighting
Information Technology Facility - General Construction
Jessup Hall- Install Fire Sprinkler System
Lindquist Center-Replace Hydraulic Elevator
Maclean Hall-Classroom Expansion
Maclean Hall-Replace Windows
North Hall-Replace 3rd & 4th Floor Roof Sections
OC,JS,SH,MH,MLH,PH-Install Perimeter Access System
Pappajohn Biomedical Discovery Bldg - Construct Facility
Parklawn-Replace Roof
Pentacrest-Install Handrails at Entrances to Pentacrest Buildings
PARKING-Expansion of Commuter Lot 75
Van Allen- Modernize Center & East Elevators
Westlawn-Masonry Repairs
|
|
|